How Long Does It Take To Fit A New Kitchen? Timeline Guide 2027

Planning a new kitchen involves more than choosing cabinets, worktops, and appliances. You also need to consider how long the installation will take, as it is one of the most disruptive processes. You lose your cooking space, your sink, and often your routine for a while. 

So, how long does it take to fit a new kitchen? A straightforward kitchen installation typically takes around 2-4  weeks. Complex kitchen projects involving structural works or bespoke designs may take 8 to 16 weeks. 

The exact timeframe depends on the kitchen’s size and the work involved. It also depends on whether you need additional plumbing, electrical work, or structural changes. Several factors like removing the old kitchen, preparing the room, ordering materials, etc can extend the project timeline. 

In this guide, you’ll discover the kitchen fitting timeframe, what drives the time duration, and how to speed up the process. Let’s start.

How Long Does It Take To Fit A New Kitchen? Timeline Explained

A typical kitchen fitting project takes around two to four weeks, depending on its complexity. However, the time on site is only part of the picture. Unit and appliance lead times, worktop fabrication, and drying times may extend the duration. Here’s a comprehensive timeline:

Preparation Time: Before Work Starts

Kitchen units and appliances can take several weeks to arrive. Even a single missing or damaged item can hold up the whole job. Before the old kitchen comes out, confirm delivery dates for all units, worktops and appliances. When the deliveries arrive, check each item for damage and missing parts. It’s also worth having your fitter measure the space to confirm that everything will fit as planned.

Removing the Old Kitchen: 1-2 Days

The fitter removes the existing cabinets, worktops, appliances and any tiles, flooring or wall coverings that are in the way. A small, simple kitchen can be cleared in a day. Larger rooms or heavier demolition take longer.

Stripping the room can reveal damp, damaged plaster or old wiring and pipework that need attention before the new kitchen goes in. These are common causes of delay.

Plumbing and Electrical Preparation: 1-3 Days

This stage may include moving pipes, altering waste connections, adding sockets or installing new circuits. Keeping the sink, cooker, and appliances in their current positions keeps it short. Changing the layout or upgrading the electrics adds time.

In England and Wales, new electrical circuits are generally covered by Part P of the Building Regulations. The work should be done by a registered electrician or signed off by building control, and you should receive a certificate when it’s finished. Gas appliances and gas pipework must be handled by a Gas Safe registered engineer.

Plastering, Making Good and Flooring: 1-5 Days

If walls need re-skimming or repairs, build in time for plastering. Fresh plaster usually has to dry before it can be painted, so this can add several days or more depending on conditions.

Flooring is often laid before the cabinets, but some fitters prefer to lay it afterward. Agree on this before work starts, because it changes the order of the job.

Installing the Cabinets: 1-3 Days

The fitter positions and levels the base units, fixes the wall cabinets, and checks that doors and drawers line up. A small kitchen may take a day. A larger one with corner units and bespoke features can take several days.

Accurate measurements and level floors and walls make this stage faster. Uneven surfaces or late changes to the layout add time.

Fitting the Worktops: 1-3 Days (Waiting Time Excluded)

Laminate and some timber worktops can usually be cut and fitted on site in a day or two.

Quartz, granite and other stone worktops are different. The fabricator takes a template once the cabinets are installed and levelled, then makes the worktop to size. Fabrication typically takes around one to two weeks, though this varies by supplier. During this time, you may be without a usable worktop or sink, and it often becomes the longest single wait in the project.

Appliances and Finishing Touches: 1-2 Days

The last stage covers fitting appliances, connecting the sink and taps, adjusting doors, sealing joints, and tidying up. Timing depends on the number of appliances and the connections they need.

Splashbacks, Tiling and Decorating: 2-5 Days

Tiling can only start once the worktops are in, and grout and sealant need time to set. Painting follows plastering and any tiling. If these are part of your project, allow extra days at the end.

Here’s the realistic timeline at a glance:

Project TypeAverage Timeline
Same layout, laminate worktops, no decorating1-2 weeks
Same layout, stone worktops2-3 weeks
New layout, new electrics, plastering and decorating3-4+ weeks

What Can Influence a Kitchen Installation Timeline?

Several factors determine how long it takes to fit a new kitchen. Even two kitchens of similar sizes can have different installation schedules because of differences in layout, materials, and preparation work.

Kitchen Size and Layout

A small kitchen with a simple layout generally takes less time to install than a large kitchen with an island, multiple cabinet runs, and additional storage.

However, size isn’t the only consideration. A compact kitchen with awkward corners, uneven walls, or complicated cabinetry may require more precise fitting than a larger, straightforward space.

Changes to Plumbing and Electrics

The water supply, drainage, and electrical connections may need fewer alterations if you change the layout. Moving the sink, dishwasher, oven, or hob can require additional plumbing or electrical work. Major changes may also involve lifting flooring, opening walls, or arranging specialist tradespeople. Extensive changes will require more installation and preparation time.

Choice of Worktops and Cabinets

Standard, readily available cabinets are generally quicker to install than bespoke units that require custom manufacturing. Worktop material also matters. Laminate worktops can often be fitted relatively quickly. Stone worktops usually require templating and fabrication before installation.

If your kitchen includes made-to-measure cabinetry, specialist finishes, or unusual dimensions, allow extra time for manufacturing and adjustments.

Availability of Materials and Tradespeople

Even a straightforward kitchen installation can be delayed if cabinets, appliances, or worktops arrive late.

The project may also depend on several tradespeople working in sequence. For example, plumbing and electrical preparation may need to be completed before cabinets are installed. Plus, some final connections cannot happen until the worktops are in place. Confirm delivery dates and coordinate the schedule before work begins to prevent unnecessary delays.

Unexpected Problems During Removal

Removing an old kitchen can reveal problems that weren’t visible beforehand. Damaged plaster, leaking pipes, uneven floors, or unsuitable electrical wiring need to be addressed before installation continues. These issues can add time and cost to the project. You can contact experts for a  thorough survey to identify some potential problems in advance. 

How to Speed Up Kitchen Fitting Timeframe?

A little preparation can help keep your kitchen installation on schedule. It’s true that some tasks cannot be rushed. But at least you can reduce avoidable delays by handling the process smartly. Here’s how:

Finalise the Design Before Installation

Confirm the cabinet layout, appliance positions, worktop measurements, and storage requirements before installation begins. Last-minute design changes can affect measurements, material orders, and the work already completed. Make sure the appliances are compatible with the planned cabinet sizes and available connections. 

Order Materials in Advance

Check that cabinets, worktops, handles, sinks, taps, and appliances are ordered with enough time for delivery. Bespoke items and stone worktops may require additional manufacturing time. Ideally, confirm that the essential materials are available before scheduling the main installation work. 

Keep the Existing Layout Where Possible

Keeping the sink, cooker, and major appliances in their existing positions can reduce the amount of plumbing and electrical work required. If your current layout works well, replacing the cabinets and worktops without major changes may make the project simpler and quicker.

However, don’t keep an unsuitable layout just to save a few days. The kitchen should still meet your practical needs and comply with relevant safety requirements.

Prepare the Room Before Work Begins

Clear the kitchen of food, utensils, furniture, and other belongings before the installation team arrives. A prepared workspace helps tradespeople concentrate on the installation. Arrange suitable access for deliveries and make sure the old kitchen can be removed smoothly.

If painting, plastering, or flooring needs to be completed before the cabinets are fitted, coordinate these tasks with your kitchen fitter.

Coordinate Tradespeople Carefully

Kitchen installations often involve fitters, plumbers, electricians, tilers, and sometimes decorators. Their work needs to happen in the correct order to avoid rework.

Agree on a schedule with the people involved and confirm when each stage should be completed. Allow some flexibility for tasks that depend on measurements, deliveries, or inspections.

Bottom Line

So how long does it take to fit a new kitchen? A new kitchen installation usually takes around two to four weeks for a straightforward installation. A more involved renovation may take longer. Bespoke worktops, layout changes, additional plumbing, electrical upgrades, and unexpected repairs can extend the timeframe.

The key is to plan the project as a whole rather than focusing only on the days spent fitting cabinets. Material deliveries, preparation work, and the availability of different tradespeople can all affect when your kitchen will be ready to use.

Finalise the design, order materials in advance, and coordinate the installation schedule to keep the work on track. Hire a professional kitchen fitter like Formosa Bathrooms & Kitchens and ask for a realistic timeline based on your kitchen requirements.

Frequently Asked Questions About Kitchen Installation Timeframe

How Long Does a Kitchen Installation Take?

A kitchen installation usually takes 2-4 weeks. Complex installations may take 8 to 16 weeks or more.

Can a Kitchen Be Installed in One Day?

No, a complete kitchen installation can’t be done in a single day. Even a small kitchen requires 1-2 weeks for completion.

How Long Does It Take to Install Kitchen Cabinets and Worktops?

Kitchen cabinets and worktops usually take 3-5 days of direct labour. The whole process on site can take up to 1-3 weeks depending on which worktop you’re using.

Can I Use My Kitchen During Installation?

No, you can’t use your kitchen during the installation process. The sink, cooker, and worktops are often unavailable during the project. However, the disruption depends on the project.

Does a Small Kitchen Take Less Time to Install?

Yes, kitchen size matters. A small kitchen definitely takes less time to install than a large one.

How Long Should I Wait Before Using My New Kitchen?

You can usually start using your new kitchen once the essential installations and connections are complete and the relevant tradespeople have confirmed that everything is safe.